JIRA and MS Project synchronization
Connect MS Project with Atlassian JIRA at almost no additional effort. Make the tasks of your projects available to JIRA users for browsing, updating and progress reporting and transfer changes back from JIRA to the original MS Project documents.
Key features
|
|
When it comes to managing a project, Microsoft Office Project is a de facto standard tool for developing and maintaining a project plan, managing costs, working with dependencies and levelling resources, while Atlassian JIRA is a powerful issue tracking system boosting your project teamwork by ensuring effective team management and progress tracking. Using the Ceptah Bridge plugin, you can make the two systems work together at almost no additional effort.
You create and maintain the project plan in MS Project, while the team members you manage use JIRA to browse their assignments and report the progress of the tasks. Our connector will take care of transferring the data between the systems, including reflecting the progress information back to your Microsoft Office Project document.
After being installed, the Bridge extends the MS Project main menu with its own items to expose the synchronization features. Technically, the connector is a Microsoft Project add-in and has to be installed on each MS Project computer where synchronization with JIRA is needed.
Check out the slide shows of the Ceptah Bridge plugin in use.
Download
Give it a try by downloading and installing a demo version from the download page. The trial version has all features of the full package with the only exception that it processes a limited number of tasks in a project.
More info
For more information, please proceed to the following.
- Slide shows of the Bridge in use
- Concept
- User's Guide (PDF)